19 May: Over 90% of orders sent within 2 business hours. Posting Australia wide.
CaravansPlus Accessories Shop
Cart
CaravansPlus.com.au

LED Down Light Long Lead - Suits Camec 040864 Range Hood

LED Down Light Long Lead - Suits 040864 Range Hood
LED Down Light Long Lead - Suits 040864 Range Hood
LED Down Light Long Lead - Suits 040864 Range Hood
LED Down Light Long Lead - Suits 040864 Range Hood
LED Down Light Long Lead - Suits 040864 Range Hood
LED Down Light Long Lead - Suits 040864 Range Hood
Suits Camec 12V Rangehood
Suits Camec 12V Rangehood
Suits Camec 12v Range Hood
Suits Camec 12v Range Hood
$29.25
$23.95
6 In Stock Now.
Postage & ETA
Enter your postcode for delivery cost.
Postage: $11.40 (Combine & Save)

Stock Update - 19th May 2024

Yes, we have stock. Right now there are 6 of these held at our warehouse (Queanbeyan NSW).
Our stock levels are real and live. If you order now we will get it out with our next daily freight.
We aim to hold the most stock and have the fastest delivery on all caravan accessories and spare parts.

Description

LED Down Light Long Lead - Suits Camec 040864 Range Hood

Features

  • 1 year warranty.

Specifications

  • Model: 041751
  • Brand: Camec
  • 67mm Diameter
  • Lead approx. 70cm
  • Shipping Weight: 60 grams.
  • Shipping Dimensions: 6 cm x 6 cm x 4 cm.

Related Products

Camec 12V Stainless Steel Rangehood With Twin LEDs - Surface Mount 586mm WideSpecial Price

Camec 12V Stainless Steel Rangehood With Twin LEDs - Surface Mount 586mm Wide

1 In Stock Now.
$295.60
$225
View

Frequently Bought Together

LED Down Light, Short Lead (PCB Side) Suits Camec 040864 Range Hood

LED Down Light, Short Lead (PCB Side) Suits Camec 040864 Range Hood

23 In Stock Now.
$32.00
$25.95
View